Dubao Self-priming Pump Installation Manual

Dubao Self-priming Pump Installation Manual


Self-priming Pump Installation Manual
Installation process of Dubao self-priming pump
(1)Fill the pump head with water before use;
(2)Connecting the import and export;
(3)Open the inlet and outlet ball valves;
(4)Connect the power supply;
(5)Stop immediately after starting the switch to confirm the forward operation;
(6)Check whether the current is overloaded;

 

PS: