Dubao External Vertical Pump Installation Manual
External Vertical Pump Installation Manual
Installation process of Dubao External Vertical Pump:
(1)The liquid level in the tank should pass through the pump head;
(2)Connect the inlet and outlet and open the inlet and outlet ball valve;
(3)Connect the power according to the picture;
(4)Stop immediately after starting the switch,confirm positive operation;
(5)Check whether the current is overloaded;
PS: